IRM International
This is an automatically generated AboutUs page for IrmInternational.com. Click the "Edit" button at the top of the page to make changes. Please read our Getting Started page if you need any help.
Categories:
- AboutUs AutoGen
- 2N+0
- 2N+1
- 2N+2
- ACD
- Automatic Call Distribution
- ATO
- Automatic Throw Over
- ATS
- Automatic Transfer Switch
- Bandwidth
- Bandwidth Capacity
- Business Continuity
- BCP
- Business Continuity Planning
- Cabinets
- Cable Paths
- Cabling
- Call Center
- Call Logger
- Call Recorder
- Campus Network
- Capacity Planning
- CAT 5
- CAT 5E
- CAT 5e
- CAT 6
- Client Relationship Management
- Comm Raceways
- Communication Systems
- Computer Systems
- Conduit Convention
- Contingency Plan
- Contingency Planning
- Copper cable
- Copper cabling
- Corporate Headquarter
- CRM
- CTI
- Computer Telephony Interface
- Customer Care Center
- Customer Relationship Management
- Data Center
- Data Communication Systems
- Data Processing
- Disaster Recovery
- Disaster Recovery Planning
- DP
- DRP
- Duct bank
- Equipment Forecast
- Fault Tolerance
- Fault Tolerant
- Fiber Optic
- Floor Loading
- Frame Relay
- Generator
- Grounding Plan
- Horizontal cable distribution
- Hub
- HVAC
- IDF
- Information Technology
- Intermediate Feeder Span
- IT
- IT facility
- IT Infrastructure
- IVRU
- Interactive Voice Response Unit
- LAN
- Local Area Network
- Local Carriers
- Long Distance Carriers
- MAN
- Management Information Systems
- MDF Convention
- Metropolitan Area Network
- Migration Management
- MIS
- Modularity
- Move Management
- N+0
- N+1
- N+2
- NCC
- NER
- Network
- Network Control Center
- Network Equipment rooms
- Network Operating Center
- NOC
- OC3
- OC12
- OC48
- OC92
- PBX
- PDU
- Phone systems
- Point-to-point
- Multi-point
- POP room
- Power Consumption
- Power Systems
- Project Control
- Project Leadership
- Project Management
- Project Office
- Racks
- Raised Floor
- Redundancy
- Redundant
- RFI
- RFI Skin Shield
- Riser systems
- Roof Requirements
- Router
- Seed Migration
- Static Switch
- Strategic Infrastructure
- Structured Cabling
- Switch
- T-1
- T-3
- T-COM
- T-COM Entrance Facilities
- Technology
- Technology Budget
- Technology Forecast
- Technology Life Cycle
- Technology Planning
- Telecom
- Telecom Raceways
- Telecommunication
- Telecommunication entrance
- Telecommunication Raceways
- Telephone
- Telephone Systems
- Trader Turret
- Trading Floor
- UIO Configuration
- Uninterruptible Power Supply
- UPS
- Voice Communication
- Voice Over I/P
- Voice Mail
- Voice systems
- WAN
- Wide Area Network
- Wireless Network
- Wireless Technology
- Wiring Convention